Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 67

Installation tips

3) Ensure the filter is clean.
4) Place unit in vertical
operating position and
allow 2 hours before initial
use in order to avoid
malfunctions.
EN
1) Do not block or restrict the
airflow around the unit. Make
sure the air inlet exhaust
grills are not obstructed.
Allow 20cm of clearance
around the unit and 40cm
above.
2) Place the unit in an area
where the temperature
levels will not fall bellow 5ºC
(41ºF) There is a possibility
the coils will collect frost at
temperatures that are under
5ºC (41ºF), which may result
in low performance.
5) Before the initial operation, please check,
if the water level switch, located within the
water bucket area, is in the right position.
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Av1-12lAv1-12lbs

Table des Matières