Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 73

Installation tips

3) Ensure the filter is clean.
4) Place unit in vertical
operating position and allow
2 hours before initial use in
order to avoid malfunctions.
EN
1) Do not block or restrict
the airflow around the
unit. Make sure the air
inlet exhaust grills are not
obstructed. Allow 20cm of
clearance around the unit
and 40cm above.
2) Place the unit in an area
where the temperature
levels will not fall bellow 5ºC
(41ºF) There is a possibility
the coils will collect frost
at temperatures that are
under 5ºC (41ºF), which may
result in low performance.
5) Prior to initial use, please remove the water
bucket and check if any packaging parts (for
example: the draining hose) are included.
Remove and re-position the water bucket
firmly into place.
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ep3-ion20lEp3-ion20lbs

Table des Matières