CLIVET BOX-SL 2 Instructions Pour L'installation, L'utilisation, L'entretien page 53

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
l
WARNING
The bottom of the unit must be 10-18 mm higher
than the false ceiling. In general, measurement
"L" must half the length of the suspension
bolt or be long enough to stop the nuts from
coming off.
Wall
L
False ceiling
a
CAUTION DANGER
Check that the unit is completely horizontal.
Incorrect installation can cause the drain pipe
to go back into the unit or possible water leaks.
Fig. 7
10-18mm
Main body
Fig. 8
Water level
l
WARNING
Check that the indoor unit is horizontal. The
unit has a drain pump and a float switch. If the
unit tilts in the opposite direction to that of
the condensate flow (with the drain pipe side
raised), the float switch may not work properly
and cause a water leak.
NOTE FOR INSTALLATION IN NEW BUILDS
Main body
M6 x 12 bolts
l
WARNING
When the unit is to be installed in a new build,
the hooks may already be fitted in the ceiling.
In this case, check that the hooks have not
come loose due to concrete shrinkage. After
installing the indoor unit, fit the installation
template on the unit (with M6X12 bolts) to
determine the size and the position of the
opening to be made in the ceiling. Continue
with the installation following the instructions
above.
Fig. 9
Installation
template
Fig. 10
13

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ia2-xy sérieIa2-xy 70mIa2-xy 105mMc2-y 140tMc2-y 160t

Table des Matières