Cable Lock - Zephyr Titan Island AK7736AS Guide D'utilisation, D'entretien Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Cable Lock

A cable locking connector (not
supplied) might be required by
local codes.
Check with local
requirements and codes, purchase
and install appropriate connector if
necessary.
Cable Lock
FIG. G
!
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
6. Remove tape securing electronics mounting bracket to hood and reposition electronics mounting bracket
with (2) M4 x 8 screws (FIG. G). Install electrical and duct work. A cable lock, not supplied, might be
required by local codes (FIG. G). Seal duct work with aluminum duct tape.
7. Power up hood, verify all functions and check for leaks around duct tape.
8. Assemble Top Duct Covers (with louver holes) together over Top Support Frame, secure Top Duct Covers
together by magnetic strips.
9. Secure Top Duct Covers to Top Support Frame by using (4) 3/16 x 1/4" screws (2 screws for each Top Duct
Cover). (FIG. H).
10. Assemble Bottom Duct Covers together over Top Duct Covers and secure together by magnetic strips.
Bottom Duct Covers should rest on top of the Hood Body.
Top Support Frame
Top Duct Covers
Bottom Duct Covers
Bottom Support Frame
11
1
FIG. H

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Titan island ak7742asTitan island ak7748as

Table des Matières