6.
Prepare the Wall Surrounds
(1) Mark the center of the
valve.
(1) Marquer le centre des
valve.
(1) Marque el centro de las
válvula.
Prepare the Plumbing End Wall
NOTE: Holes for the mixing valve and shower must be cut into the plumbing end
wall.
Refer to the trim manufacturer's instructions for necessary hole sizes. Verify that
any escutcheon, flange, or cover plate is large enough to cover the hole for the
component.
Lay out and mark the centerline location for the mixing valve on the back side of
the end wall. (1)
Drill 1/4" (6 mm) pilot holes at the marked locations from the back side of the
end wall. (2)
CAUTION: Risk of product damage. Failure to follow directions regarding your
blade's cutting direction may damage the plumbing end wall finish. Cut the holes
from the front side of the wall for: hole saws, rotary tools, hand-held jigsaws, or
other saws with a blade that cuts on the push stroke. Cut the holes from the back
side of the wall for other reciprocating saws with a blade that cuts on the pull
stroke.
Carefully cut the fitting holes to the correct diameter. Refer to the trim
manufacturer's instructions for proper diameter. (3)
Carefully clean any debris from the receptor to reduce the risk of surface damage.
Optional Accessories
IMPORTANT! Do not install accessories that require backing or support. Installations
that require drilling into the wall surrounds are not recommended. Such installation
could void the warranty.
Sterling
(2) Drill the pilot hole on the
back of the wall.
(2) Percer les trous-pilote
sur le mur arrière.
(2) Taladre los orificio guía
en la pared posterior.
21
(3) Cut the hole through
the front of the wall.
(3) Découper les orifice
dans le mur.
(3) Perfore los orificio a
través del frente de la pared.
1092037-2-E