Installation Procedure - Mobiclinic GRÚA FORTUNA Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 19
PT
DE
IT
FR
4. INSTALLATIONS
4. INSTALLATIONS
4.1. Inspection and Acceptance
4.1. Inspection and Acceptance
Please verify if there are omissions for parts (checklist for accessories
Please verify if there are omissions for parts (checklist for accessories
shall be subject to list attached with the product).
shall be subject to list attached with the product).
DESCRIPTION
DESCRIPTION
Frame
Frame
Control Box
Control Box
Actuator
Actuator
Controller+Cable
Controller+Cable
Open Spanner
Open Spanner
#16 and #17
#16 and #17
User's manual
User's manual
Step 3: Installation of control box
Step 3: Installation of control box
1. Fasten the 2xM5x10 screws into threaded holes on frame as the
1. Fasten the 2xM5x10 screws into threaded holes on frame as the
following picture shown
following picture shown
Step 4: Remove and install the battery box
Step 4: Remove and install the battery box
Removal: Press down the switch A and remove battery along direction
Removal: Press down the switch A and remove battery along direction
of B.
of B.
Installation: Place the battery in place and press the switch along direction of
Installation: Place the battery in place and press the switch along direction of
C. Ensure the battery won't be separated without pressing the switch.
C. Ensure the battery won't be separated without pressing the switch.
12
EN
ES
QUANTITY
QUANTITY
IMAGE
IMAGE
1 set
1 set
1 pc
1 pc
1 pc
1 pc
1 set
1 set
1 pc
1 pc
N/A
N/A
Electric Patient Lift FORTUNA

4.2. Installation Procedure

4.2. Installation Procedure
Please verify if there are omissions for parts (checklist for
Please verify if there are omissions for parts (checklist for
accessories shall be subject to list attached with the product).
accessories shall be subject to list attached with the product).
Step 1: Release the locknut and bolt and then raise up the
Step 1: Release the locknut and bolt and then raise up the
frame and align the holes. Fix bolt as shown in drawing on the
frame and align the holes. Fix bolt as shown in drawing on the
right and have not properly attached (make sure no movement
right and have not properly attached (make sure no movement
on the frame).
on the frame).
Step 2: Release the strap
Step 2: Release the strap
① Locknut
① Locknut
② Bolt
② Bolt
③ Strap
③ Strap
2. Rotate the lock to direction of open. Fasten to control box into frame
2. Rotate the lock to direction of open. Fasten to control box into frame
and have the upper screws locked.
and have the upper screws locked.
3. Rotate the lock 90 degree to the right and lock the control box.
3. Rotate the lock 90 degree to the right and lock the control box.

Publicité

Table des Matières
loading

Table des Matières