Inspection And Servicing - Graf PLATIN XXL 20.000 Notice D'installation Et D'entretien

Masquer les pouces Voir aussi pour PLATIN XXL 20.000:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

The entire system must be checked for tightness, cleanliness and stability at least once every three
months. The entire system should be maintained approximately every 5 years.
This involves cleaning all system parts and checking that they are functioning correctly so that
extinguishing water can be easily extracted at all times.
For maintenance, proceed as follows:
Clean surfaces and built-in parts with water
Remove all dirt and contamination from the tank
Functional check of the extinguishing water removal components
Please note the national requirements.
mail@graf.info
www.graf.info
9.

Inspection and servicing

www.graf.info
/
2021-08

Publicité

Table des Matières
loading

Table des Matières