Ayce 0102B Mode D'emploi page 21

Projecteur avec detecteur de mouvement
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation of the bulb:
1. turn off the power before installation.
2. unscrew the screw high protection and open it.
3. remove the bulb from its packaging. Do not touch the bulb with bare hands. Use a cloth to install
the bulb in the fixture. Press first the bulb from one side of its mounting in the luminaire, to push
the metal bar; You can then insert the bulb on the other side by pressing on the metal strip.
4. after changing the bulb, check the correct position of the sealing ring.
5. attach the protection by tightening the screw. Over tightening can damage the glass.
Check carefully whether the strain relief properly
and use them appropriately.
Fix the cover by tightening to the junction box.
Fasten the floodlight with screws and bolts in the
desired position. (Fig. 6)
Fig. 6
21 | 21
GB

Publicité

Table des Matières
loading

Table des Matières