1
About this manual
1.1 Applicability
This manual describes the installation, commissioning, function, operation,
maintenance and dismantling of the inverter for grid-connected photovoltaic
systems.
When installing the remaining components, e.g. the photovoltaic modules, the
DC or AC wiring and other accessories, be sure to observe the appropriate instal-
lation instructions provided by each manufacturer.
StecaGrid 000+ Master-M: Master, Multi-Contact connectors (MC4, Sunline ),
30 V / 60 Hz.
StecaGrid 000+ Slave-M: Slave, Multi-Contact connectors (MC4, Sunline ), 30 V
/ 60 Hz.
1.2 Users
Installation, commissioning, operation, maintenance and deinstallation of the
inverter may only be done by trained personnel in accordance with the applicable
on-site installation regulations. The professional personnel must be familiar with this
operating manual and follow the instructions contained herein.
The end user may only perform operating functions.
1.3 Description of symbols
1.3.1 Structure of the warning notices
SIGNAL WORD
Type, source and consequences of the danger!
Measures for avoiding danger
1.3.2 Danger levels in warning notices
Danger level
Probability of occurrence
imminent threat of danger
DANGER
possible threat of danger
WARNING
possible threat of danger
CAUTION
CAUTION
possible threat of danger
1.3.3 Notes
NOTE
Note on easier and safer working habits.
Measures for easier and safer working habits.
1.3.4 Other symbols and markings
Symbol
-
•
emphasis on issue at hand emphasis on issue at hand
4
Consequences resulting from
non-compliance
death, serious bodily injury
death, serious bodily injury
minor bodily injury
property damage
Meaning
call to action
result of action
action description
list
EN
731.614 | 10.04