dirna Bergstrom bycool green line COMPACT 1.4 SCANIA Instructions De Montage page 16

Masquer les pouces Voir aussi pour bycool green line COMPACT 1.4 SCANIA:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

COMPACT 1.4
EN
Connect the (2) 4 ways boxes, the (2) 2 ways
10
boxes and connect also the feeding wiring in
the 2 ways boxes in T."
10a
Introduce the cabling in the gap (H) in the front
in order not to interfere in the adjustment of the
channelling equipment with the unit base. The
power cable connection should be outside of
the front.
10a
16
Air conditioning for vehicles
H
10

Publicité

Table des Matières
loading

Table des Matières