5) When the heater is running, there will be condensation water
discharged from the bottom. Please hold the drainage nozzle
(accessory) into the hole and attach it well, then connect a pipe to
drain the condensation water out.
B.Wiring
1) Connect to appropriate power supply; the voltage should comply
with the rated voltage of the products.
2) Heater must be grounded.
3) Wiring must be handled by a professional technician according to
the circuit diagram.
4) Set leakage protector according to the local code for wiring (leakage
operating current ≤ 30mA).
5) The layout of power cable and signal cable should be orderly and
not interfere with each other.
C . Switch on after finishing all wiring construction and
re-checking.
9