Correcting The Filling Quantity For Long Service Hoses - Waeco AirConServiceCenter ASC 5500 G RPA 2020 Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 223
ASC5500G RPA 2020
"Service completed" displays the amount of service work performed
using the air conditioning service unit since the last reset (see date).
9.8
Correcting the filling quantity for long service
hoses
I
NOTE
 If longer or shorter service hoses are required for the unit, you need
to adjust the filling quantities to the new hose lengths.
 The service hoses for the high and low pressure sides must always
be of the same length, as otherwise the filling quantities will not be
correctly measured.
1. In the basic menu, use the cursor keys  or  to select
"Other selections":
2. Press ENTER to confirm.
3. Use the cursor keys  or  to select "Service":
4. Press ENTER to confirm.
5. Enter the password "7732".
6. Enter the hose length in centimetres.
7. Press ENTER to confirm.
EN
Service completed:
Number
STOP-EXIT
Short selection
Free selection
Other selections
ENTER-OK
Int. vessel filling
Flushing
Reset scales.
Service.
Service tasks
07/03/20
4
131

Publicité

Table des Matières
loading

Table des Matières