Waeco AirConServiceCenter ASC 5500 G RPA 2020 Notice D'utilisation page 116

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 223
Operation
8.7.4
Selecting connections
1. Select the parameters in accordance with the air conditioning system
connections:
– Air conditioning system has a high pressure and a low pressure
connection:
Select LP/HP.
– Air conditioning system only has a high pressure connection:
Select HP.
– Air conditioning system only has a low pressure connection:
Select LP.
2. Press ENTER to confirm.
3. Once all settings have been entered, press ENTER to start the
process.
8.7.5
After ending the air conditioning service
✓ After the air conditioning service has finished, you are prompted to
disconnect the hoses of the AirConServiceCenter from the vehicle air
conditioning system.
1. Disconnect the service hoses (13) and (14) and press ENTER to
confirm.
✓ The service hoses will now be drained. The unit is then ready for
further use.
2. Screw the valve caps of the air conditioning system back on the
connections.
116
HP/LP
PORT
HP
PORT
LP
PORT
ENTER-OK STOP-EXIT
Process start?
ENTER-OK STOP-EXIT
ASC5500G RPA 2020
EN

Publicité

Table des Matières
loading

Table des Matières