Transport; Transport And Packing; Transport Method; Unpacking - Bosch Start Line TCE 420 Notice Originale

Machine à monter les pneus
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 50
en
32 | Start Line TCE 420 | Product description
3.4

Scope of delivery

Denomination
TCE 420
Bead beaker assembly
Mounting lever
Inflation gun with pressure gauge
Bead breaker cover
Protection cover claw
Mounting tool cover
4.

Transport

4.1

Transport and packing

The TCE 420 must be placed in the original
packaging for transport. The package should comply
with the following requirements.
The package size requirement:
Dimensions
Package size
Width
1150 mm
Length
1200 mm
Height
1050 mm
4.2

Transport method

Open the top package, plug the fork of the forklift
from bottom of the original package.
i
Keep the original package for the future
transporting.
|
1 695 108 074
2016-07-27
5.

Unpacking

Quantity
5.1
Unpacking
1
When unpacking, the operator should wear the
1
proper protective gear such as protective gloves.
1
Check the delivery carefully to make sure that all
1
parts have been delivered. If there is any mistake,
1
please contact your authorized dealer at once.
1
The objects in the carton, such as boards, nails,
1
screws and plastic bags, should be stored in a safe
location.
If there are any environmentally harmful or non-
degradable substances, you should treat them in
accordance with local laws and regulations.
!
During the process of unpacking, assembly and
transporting, you should follow the following
requirements and handle with care. Otherwise, the
TCE 420 could be damaged.
1. Detach the upper cover of the carton and make
sure whether there is any damage or not during
transporting.
2. Find the fastening screws holding the TCE 420 on
the pallet.
5.2

Setting up the TCE 420

!
Steps 1 - 11 must be completed on the pallet. Do
not loosen the screw and secure the mounting arm
until installation is complete while the TCE 420 is
being moved.
1. Fasten the hoisting strap (mod. DR 750, 3 m and DR
735, 1.5 m, factor 6:1).
!
Hoisting strap requirement: more than 1 metric ton
and safety factor 6:1.
2. You should use the above method whenever the
TCE 420 is moved.
!
Do not move the TCE 420 unless the TCE 420
has been disconnected from the voltage and
compressed air supplies.
Robert Bosch GmbH

Publicité

Table des Matières
loading

Table des Matières