Monument Water Systems Plumbline 3000 Série Guide D'installation / Guide D'utilisation page 16

Adoucisseurs d'eau
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

System Setup (continued)
7
Add water to brine tank approximately 1" above the grid plate.
Do not add salt to the brine tank at this time.
Fill water 1" above
grid plate
8
With the by-pass valve in by-pass position, turn on the main water
supply. Open a cold soft water tap nearby and let run a few minutes
or until the plumbing is free from foreign material (usually solder)
that may have resulted from the installation. Once clean, close the
water tap.
9
Your Plumbline system uses 24 Volt-60 Hz electrical power. Always use
the transformer supplied with the unit. Connect the transformer to
nearest 120 Volt, grounded outlet.
10
Set resin volume.
• When the system is first plugged in, the display indicator will
point to Resin.
• Hold the Up button to begin programming.
• Use the Up or Down arrow to select the amount of resin in your
tank using the chart below to find the correct setting. Resin range
is 0.25-4.0 cu. ft. Do not use the F setting as it is reserved for filter
systems only.
• Hold the Extra Cycle button for five seconds to save the resin
volume.
15

Publicité

Table des Matières
loading

Table des Matières