System Setup (continued)
3
Connect brine line between the salt storage tank and
control valve using ⅜" tubing and parts included in installation
packaging. Hand tighten each nut, then gently snug with wrench.
⅜"
Tubing
Connection
4
Confirm drain line flow control (DLFC) installation by removing
retainer clip and disassembling as shown. Apply teflon tape to
barbed drain adapter. Thread barbed drain adapter into DLFC
adapter. Reassemble DLFC assembly and secure with retainer
clip.
DLFC
Retainer Clip
13
DLFC Adapter
Barbed Drain Adapter