Monument Water Systems Plumbline 3000 Série Guide D'installation / Guide D'utilisation page 14

Adoucisseurs d'eau
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

System Setup (continued)
3
Connect brine line between the salt storage tank and
control valve using ⅜" tubing and parts included in installation
packaging. Hand tighten each nut, then gently snug with wrench.
⅜"
Tubing
Connection
4
Confirm drain line flow control (DLFC) installation by removing
retainer clip and disassembling as shown. Apply teflon tape to
barbed drain adapter. Thread barbed drain adapter into DLFC
adapter. Reassemble DLFC assembly and secure with retainer
clip.
DLFC
Retainer Clip
13
DLFC Adapter
Barbed Drain Adapter

Publicité

Table des Matières
loading

Table des Matières