Operation; Start-Up And Operation - Omcan CE-IN-3232 Manuel

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
this construction.
Proper gas piping: In order to insure proper performance of this unit as well as other gas appliances on the
same gas supply lines, a well-planned and properly sized gas supply system is a must. If the appliances
are to be connected to existing piping, the piping should be checked for adequate capacity enabling full
firing for all of the units that are to use the piping run.
Pipe thread sealant (joint compound) shall be used sparingly and only on male threads of pipe joint. Such
compounds shall be resistant to the action of L.P. gases.
WARNING: All pipe fittings must be clean and free of dirt or other contaminants. Any loose
particles, such as dirt or metal filing, in gas lines can damage the controls and affect operation.
Make certain not to obstruct the flow of combustion and ventilation air. Insure that air intake openings
around the appliance jacket are not obstructed.
Appliance must be connected to suitable exhaust duct in compliance with all applicable local codes.
Position the appliance to insure that proper clearances for safety and service are provided.

Operation

CURING THE CLAY POT FOR FIRST TIME USE
You must prepare the tandoor's clay portion once before starting it for the first time. This seals and treats
the clay, which in turn extends the life of your tandoor.
For best results, repeat this procedure once every 2-3 months.
INGREDIENTS
Mustard oil - 1.5 Litres.
Jaggery (gur) - 1 Kg.
Spinach (Palak) - 1 Kg.
Salt - 10 Teaspoons.
DIRECTIONS
1. Mix (grind) the above mentioned ingredients in a pot until it becomes liquid.
2. Rub with a cloth on the clay portion of your tandoor.
3. Let the tandoor absorb the mixture for 30 min.
4. Then repeat steps 2 and 3 another three times.
5. Light up your tandoor on SLOW heat for 48 hours.
6. After the tandoor cools down, remove the remainder of the mixture from your tandoor using a soft moist
cloth.
START UP AND OPERATION
All appliances are operationally checked and adjusted before leaving our factory. These adjustments are
made to verify effective operation and that the appliance meets the requirements of the tests standards. At the
installation site making sure all local codes are met is the responsibility of the installer.
10

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ce-in-3434Ce-in-2830

Table des Matières