Installation - CAPITAL SPORTS Infinity Pro 4.0 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION

Take out the machine from box and put it on the flat floor.
Connecting the communication wire inside of stand post with the
communication wire inside base frame. Then Insert the upright post into
clamping ring on the both side of the main frame and fix tight with Allen
C.K.S. half thread screw M8*60*20 and Allen C.K.S. full thread screw M8*15.
1
2
EN
51

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

10032955

Table des Matières