EdilKamin MAXIMA 14 Installation, Usage Et Maintenance page 66

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 90
I
C
A
B
Fig. 1
N
M
L
Fig. 2
R
Q
Fig. 3
INSTALLATION
H
G
E
F
D
O
P
PELLET HOPPER DISASSEMBLY
In order to facilitate transport, the boiler is prepared for the
disassembly of the pellet hopper.
Proceed as follows:
Note:
1) When moving an already installed boiler, fi rst disconnect
the power cord.
2) All components are secured with screws to be removed
for their disassembly.
Fig. 1
• Remove the two doors (A and B), the side panels (C and D)
and the rear panels (E and F).
• Remove the pellet cover (G), the rear panel (H) and the front
panel (I).
• Detach the connectors of the control panel.
Fig. 2
• Remove the wheeled ash tray (L) and the "L" profi le comple-
te with magnets (M).
• Remove the top cover (N), the slotted-in pellet hopper protec-
tion grille (O) and the under-top plate (P).
Fig. 3
• Remove the two galvanized sheet-metal protections (Q and
R).
- 62
-

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Maxima 24

Table des Matières