EdilKamin MAXIMA 14 Installation, Usage Et Maintenance page 65

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 90
Fig. 1
Fig. 2
N
Fig. 3
INSTALLATION
ADAPTATION FOR PELLET LOADING
SCREW SYSTEM (optional)
The boiler is designed for pellet loading by means of a screw
feeding system.
ATTENTION: the boiler must be positioned at least 30 cm
from the wall behind it
To install the system, proceed as follows:
N.B.:
before starting, turn the boiler off and disconnect the elec-
tricity supply wire.
Figs. 1 - 2
• Remove the cover screwed onto the back of the boiler (fi g. 1),
and replace it with the fl exible pipe connection fl ange con-
tained in the system packaging (M -fi g. 2).
• The fl exible pellet feeding pipe must be connected to the
fl ange (N) (see system technical diagram).
Fig 3
M
• Insert the level sensor in the special seat on the rear of the
boiler, removing the cap fi xed with two screws.
- 61
-

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Maxima 24

Table des Matières