Operation And Monitoring; Limits Of Operation; Minimum Depth Of Coverage; Permitted Number Of Starts - ITT Lowara Z8 Série Instructions Pour L'installation Et L'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14
Installation, Operating and Maintenance Instruction
Motors which are only suitable for rotation in one
direction should not be allowed to run in reverse
for long. Pumps with single stage alternating
current motors will certainly run in the proper
direction if they are connected properly.
During the pump test it is necessary to keep the
plant under constant observation and to check the
current consumption and discharge. For new wells
or bore holes with unknown yield we recommend
checking the fall in water level as well as the sand
content of the water during the first period of
operations. Excess sand content (more than 50
3
g/m
) can lead very quickly to wear and reduced
output of the unit.
After insulation values have been measured again
after a few hours of operation the plant can be
operated automatically. To obtain comparable
values for winding resistance: Allow the motor to
cool for at least one hour before measuring.
Restarting
Each time operations are restarted proceed as in initial
operations. However, it is unnecessary to check the
insulation values, the direction of rotation or to
measure winding resistance.

6.1 Operation and Monitoring

Regular monitoring and maintenance will extend
the life of your pump or system.
You must observe the area of application given in
the Confirmation of Order.
Do not exceed the output given on the motor
rating plate.
Avoid
dry
running,
discharge valves.
Pay attention to the permitted number of starts.

6.2 Limits of Operation

The operating limits of the pump / unit regarding
pressure, temperature, performance and speed
are shown in the data sheet and / or order
confirmation and must be observed under any
circumstances!
Do not exceed the output given on the motor
name plate.
6.2.1 Flow min. / max.
If no other data are given in the curves or data sheets,
the following is valid:
Recommended minimum flow
Pump Size
for continuous operation [m
Z8-ZR855...
Z8-ZR875...
Z8-ZR895...
Z8-ZR8125...
Z10-ZR10150...
Z10-ZR10200...
Z10-ZR10275...
running
against
closed
50 Hz
60 Hz
10
12
15
18
22
27
30
36
40
50
60
80
80
100
page 33
Z12-ZR12340...
Z12-ZR12420...
Pump Size
Z8-ZR855...
Z8-ZR875...
Z8-ZR895...
Z8-ZR8125...
Z10-ZR10150...
Z10-ZR10200...
Z10-ZR10275...
Z12-ZR12340...
Z12-ZR12420...
Values are valid under the requirement NPSH
(NPSH
+ 0,5 m)
Pump

6.2.2 Minimum depth of coverage

Pump Size
Z8-ZR855...
Z8-ZR875...
Z8-ZR895...
Z8-ZR8125...
Z10-ZR10150...
Z10-ZR10200...
Z10-ZR10275...
Z12-ZR12340...
Z12-ZR12420...

6.2.3 Permitted number of starts

With electric motors, the permitted number of starts is
given in the attached motor operating instructions.
If there are not specified values for the operating
cycles in the motor instruction manual, then the values
of diagram 1 are valid.
100,0
10,0
3
/h]
1,0
1
If two different figures are given, the lower figure is
valid.
150
200
Maximum flow [m
for vertical and horizontal
installation
50 Hz
75
105
135
170
200
250
320
400
520
U
min
...refers to a
velocity of
water of max.
...m/s in the
case space
between the
pump and well
mm
casing.
4,2
1600
4,5
2900
6,8
2900
10
100
Motor power [kW]
Diagram 1
180
-
3
/h]
60 Hz
90
125
160
200
240
280
360
400
-
>
Plant
1000

Publicité

Table des Matières
loading

Table des Matières