Commissioning - Lenze Global Drive Keypad E82 Instructions De Montage

Module d'automatisme
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5

Commissioning

5
Commissioning

Connect the keypad to the AIF interface on the front of the standard device.
You can also connect or remove the keypad during operation.
As soon as the keypad is supplied with voltage, it carries out a short self test.
ƒ
The keypad is ready for operation if the operating level is displayed:
0
Current status of the standard device
1
Display of the output frequency of the inverter (the parameter to be displayed can be selected
in C0517/1)
2
Active error message or additional status message
3
Current value in % (the operating status to be displayed can be selected in C0004)
Press V to quit the operating level.
60
l
9371BC018_E82
EDK82ZBC DE/EN/FR 4.0

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Global drive keypad e82 e82zbcGlobal drive keypad e82 e82zbb

Table des Matières