Jacuzzi Omega Notice D'installation page 9

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

the spacer, until it matches up with the hole in the panel (de-
tails A, B, C, and D).
i
I (
9 detail1) In addition to the perpendicularity of the pan-
el, also check that the spacer is in contact with the panel. If this
is not the case, turn the respective cover "S2" until it rests on
the panel.
i
I (
9 detail 2) At this point, lock the panel as shown, and then
apply the cap "S6".
i
I (
9 detail 3) Apply a bead of silicon where indicated.
i
I (
10 detail1-2) Apply a bead of silicon in the groove of the
indicated profile, along the entire height, and then install in on
the panel.
i
I (
10 detail 3-4) Apply a bead of silicon to the back of the
i
compensator "A" (see
it against the wall, at the previously made holes and at the spec-
ified height as shown in fig.5 detail 1.
i
I (
10 detail 5-6) After checking perpendicularity, fasten it
to the wall as indicated.
i
I (
10 detail 7) Place the profile of the panel in contact
with the compensator.
NB: be sure not to overlap the compensator with the profile
(see detail) otherwise it will not be possible to apply the gas-
ket. See the chapter in fastening the glass panels.
i
I (
10 detail 8) Silicon the indicated area of the tray, where
compensator "B" will rest.
i
I (
10 detail 9-10) Apply a bead of silicon to the back of the
i
compensator "B" (see
it against the wall, matching it with the previously drilled holes.
i
I (
10 detail11-12) After checking perpendicularity, fasten
the compensator to the wall.
i
I (
11) Fasten the profile of the panel, using the holes on the com-
pensator as a template. Then fasten the upright to the compensator.
N.B. The maximum projection allowed for the upright in rela-
tion to the compensator is 10 mm.
Installation of structure-seat
i
I (
12 detail 1) Lift the structure where the seat will be at-
tached and position it on the tray, as shown.
i
I (
12 detail 2) Connect the tube from the drain tube on the
boiler.
i
I (
12 detail 3-4) After checking perpendicularity, fasten
the structure to the panels, as indicated.
i
I (
12 detail 5) From the back, fasten the structure to the
panel with the indicated screw.
i
I (
12 detail 6) Fasten the structure more firmly with the
screws and washers indicated.
5) along the entire height; then place
5) along the entire height. Then place
Hydraulic / electrical connections
Installation of the panel with the tap fixture
Water connections
i
I (
13) Set the panel with the tap fixture to the seat struc-
ture and, from the back, make the following connections:
- (detail 1) mixing group - supply from wall
- (detail 2) anti-scale nozzle - boiler
- (detail 3) mixing group - filling solenoid valve
- (detail 4a) panel steam nozzle - "T" connection
- (detail 4b) seat steam nozzle - "T" connection
NB: these tubes are marked with letters, as shown on the
drawing; to make operations easier, it is possible to make the
connection to the boiler subsequently, after fastening the pan-
el to the seat-structure.
I (detail 5) Finally, place the overflow tube above the tray, run-
ning it through the indicated opening.
I (detail 6) Run the tube of the shower head upwards and
through the indicated hole.
I (detail 7-8) Run the tube of the waterfall outwards, positioning
it above the panel and holding it in place with adhesive tape.
NB: since this tube, at the end, will need to be connected to
the waterfall (located above the seat), make sure that during
subsequent assembly steps it does not fall behind the panel.
Electrical connections
CAUTION! Follow very carefully the instructions in the chap-
ter on electrical safety.
Follow the symbols L: phase; N : neutral;
- Remove the wiring box cover and, after connecting, put it back
and tighten the cable clamps well.
IMPORTANT: for Countries where 220-240V voltage
is supplied by a two-phase system (L+L), the connec-
tion has to be made on terminals L and N anyway.
NB: to make operations easier, you can make these connec-
tions (except for those for the display cables) once the panel
is fastened.
i
I (
14) Make the following connections:
- (detail 1a) display cable - junction box
- (detail 1b) display cable - electronics box
- (detail 2) building electrical power supply line - junction box
- (detail 3) alarm circuit cable - electronic box (optional)
If the building has a "call for help" circuit, it can be connected to
the shower box and controlled by the key on the display.
Inside the electronic control box, near the "ALARM" cable clamp,
there are 2 terminals marked with "ALL", which correspond to the
normally open relay contacts, to which the installer can connect
the alarm circuit.
When the alarm key is pressed on the display, a relay, which is
already fitted inside the electronic box, activates the "call for
9
earth.

Publicité

Table des Matières
loading

Table des Matières