DETAIL A
SECURE WIRE
HARNESS WITH
THE 4 ZIP TIES
FROM
ACCESSORY BAG
NOTE: Thermistor wire must not touch the cooper tubes at the time to
make the routing.
Step. 4b Cut the plastic ties that are securing the extra wiring for the
Thermistor (CN44). Route the thermistor wires into the Electrical
section of the air handler on the left side of the coil.
- Secure thermistor wire as shown on DETAIL A with the provided zip
ties.
-The notch in the drain pan allows the wires to pass the drain pan,
go through the sheetmetal shelf which now supports the Coil Assembly
and enter the Electrical section of the Air Handler. Reconnect the
Thermistor (CN44) to the control board.
DÉTAIL A
DRIP LOOP
INSIDE
DRAIN PAN
USING
PROVIDED
ZIP TIES
TO ELECTRICAL
SECTION
Step. 4c In order to prevent water from running down the
Thermistor wires into the electrical area, a Drip Loop MUST be
installed to direct water into the drain pan using the provided
zip ties of the accessory bag.
3rd
1st
2nd
Step. 5 Reinstall the panels over the drains and refrigerant lines.
Next, install the panels which cover the Coil (1
rd
th
Blower (3
) and Filter (4
). NOTE: The panel which covers the Coil
Assembly will be installed upright as the original vertical orientation
from the factory, while the other panels' text will read upside down.
4th
PRIMARY
DRAIN
3/4" FPT
st
), Electrical (2
nd
),
15