Communication Connection(S) - newmotion Home Advanced 2.1 Manuel D'installation

Masquer les pouces Voir aussi pour Home Advanced 2.1:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5. INSTALLATION PROCEDURE
5.4 OPTIONAL TETHERED CABLE
Step 1; Select the appropriate grommet to suit the cable
thickness and place it in the opening of the power cable
inlet. Moisten if necessary to make it easier to feed the
power cable through;
Step 2; Detach the DC protection module and carefully
put the Phase wires (Brown, Black and Grey) and
Neutral (Blue) of the tethered cable one by one through
the module.
Step 3; Connect the tethered cable wires on the relays ,
PE cable on the terminal block, and car-communication
wire (red wire), like indicated in the 'overview tethered
cable' section;
Step 4; Take the DC-protection module and attach the
DC-protection module cable to the PCB

5.5 COMMUNICATION CONNECTION(S)

For UTP connection (preferred) proceed with 5.5a,
for GPRS connection proceed with 5.5b;
(refer to 3.4 & 3.5 Product Overview)
5.5A COMMUNICATION CONNECTION(S) (UTP)
Step 1; Feed the UTP cable(s) through the rubber
stop(s) on the data cable inlet and then connect it to
the Ethernet port(s), like indicated in the 'overview of
connections' section;
Step 2; Connect the UTP to an internet enabled router
with DHCP;
5.5B COMMUNICATION CONNECTION(S)
(GPRS)
Step 1; Check and make sure signal strength
is sufficient;
INSTALLATIEHANDLEIDING – P15
INSTRUCTION MANUAL – P15 | P15
5.6 OPTIONAL DPM (PURCHASED
SEPERATLY )
Step 1; Make sure to follow the DPM installation manual
in conjunction with this manual.
Step 2; Check if the Phase 1 in chargepoint match the
Phase 1 of the DPM device. If not, correct that first.
Step 2; Feed the UTP cable through the rubber stops
on the data cable inlet and then connect the RJ11
connector
to the P1 port. Connectors on this cable should be
straight, which means the same order on both sides of
the cable.
Step 3; Contact New Motion after step 5.7 for activation.
5.7 FINISHING UP (CLOSE ENCLOSURE)
Step 1; Check and make sure that the rubber seal is
properly in place on the edge;
Step 2; Place the cover on the charge point;
Step 3; Hand-tighten the four M4 x 12mm bolts provided
around the socket so that the cover closes on the rubber
seal but the rubber seal does not deform;
Step 4; Hand-tighten the other two M4 x 12 mm bolts
provided in the bottom of the cover;
Step 5; Turn the socket lid or dummy socket clockwise
in the cover and hand-tighten the M4 x 20mm bolt
provided;
Step 6; Switch on power to the charge point;
Step 7; Wait until charge point is fully started up (+/-10
minutes, LED should be off);
Step 8; Check that the charge point is connected to the
network. A quick check can be done via chargeportal.
newmotion.com/test. Simply enter the serial number
into the search field and click "Search". "Online" should
appear after the serial number. If "Online" does not
appear, check whether the charge point is properly
connected and try again. For persistent issues, please
contact NewMotion.
Step 9; If configuration of the charge point power
settings is needed (for example lower Amp settings)
please contact NewMotion;
VERSION 0129NM02INT01
0382NM02INT03

Publicité

Table des Matières
loading

Table des Matières