ADEO SCREEN SLMF Manuel D'installation Et D'utilisation page 15

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 18
Rolling screen installation and operation manual
PR OGRAMMING END S TOPS F ABR I C and M AS K ( proc e dure s alre ady c arrie d out in f ac tory , S HOUL D NOT be pe rf orm e d by unauthorise d pe rsonne l )
Each programming procedure consists of several steps; at the end of each step, the operator has 60 seconds to start the nex t step; this system is devised to prevent the risk of performing operations other
than those desired. Therefore, if the motor does not perform the operation exactly as indicated in the instructions, wait 60 seconds, then exit programming, or cancel the procedure as indicated at specific
point, and start the procedure all over again.
The motor's settings follow an overwriting logic: therefore, once the end stop positions have been memorised they cannot be cancelled, but only overwritten by following the above-mentioned procedure from
the start.
In order to cancel the procedure in course, simultaneously press ◼ and  at any time, until the motor has executed 6 movements.
Made by Adeo Screen Sp. Z o.o. (Poland) Specifications are subject to change without notice. E&OE
Please verify that you are working with the latest revision of this document before specifying your screen.
Doc: SLMF – Installation Manual rev1 | 20.07.2018
END S TOP M AS K M OVEM ENT ( S HOUL D NOT be pe rf orm e d by unauthorise d pe rsonne l )
TO C ANC EL THE PR OGR AM M I NG I N C OUR S E
ENGLISH
Page 15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Prmoslmf série

Table des Matières