AGA marvel MA15CL Instructions D'installation, D'utilisation Et D'entretien page 30

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Remove these 3 hose
clamps, then remove
the 3 tubes from the
drain pump
Unscrew the leveling leg so
the end of the threads is flush
with the top of the nut insert.
Additional issues to be inspected by the
installer upon service replacement:
1. The drain pump must be level.
2. No pinched water lines.
3. No interference with electrical cords or wiring.
4. The drain pump should not set on any obstacles, wir-
ing, etc.
5. Secure all hose clamps leading to and from the drain
pump.
6. Insure that the vent tube height is adequate - 18 inches
minimum.
7. Insure that drain height is adequate - maximum of 8
feet.
8. Insure that drain length is adequate - maximum of 20
feet.
9. Checked for water leaks after installation of the drain
pump.
10. Check for vibrations caused by improper installation.
11. Insure that there is no interference with back access
cover.
12. Insure that the hole grommets are in place at each
location so that any vent or drain tubes do not rub on
any sharp surfaces.
DRAIN PUMP REMOVAL INSTRUCTIONS
Figure 39
Drain pump ground
wire connection
Figure 40
30
Ice machine
power cord

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ma15cp

Table des Matières