Important - Bradley On-Site S19-921H Manuel D'installation

Douche oculaire à gravité avec bande chauffante
Masquer les pouces Voir aussi pour On-Site S19-921H:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

S19-921H, S19-921HR
Read this installation manual completely to ensure proper installation, then file it
Installation
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the
installer.
Packing List
Separate parts from packaging and make sure all parts are accounted for before
IS
T H
E
S ID
U P
discarding any packaging material. If any parts are missing, do not begin installation
until you obtain the missing parts.
Test the unit for leaks and adequate water flow. The inspection and testing results of
this equipment should be recorded weekly to verify proper operation. This equipment
should be inspected annually to ensure compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment per
ANSI Z358.1.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 1-800-BRADLEY.
Product warranties and parts information may also be found under "Products" on our
web site at www.bradleycorp.com.
This unit is to be used with tepid, potable water as defined by ANSI Z358.1. (Note: avoid
100˚ F
prolonged exposure to ambient heat sources above 100° F, or below 60° F).
60˚ F
2

IMPORTANT

11/21/2016
Bradley • 215-1714 Rev. F; ECN 16-05-066
Installation

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

On-site s19-921hr

Table des Matières