Télécharger Imprimer la page

Weka 348.1617 Série Notice De Montage, D'utilisation Et D'entretien page 11

Publicité

Les langues disponibles

Les langues disponibles

The window/door panes must be sealed all round with transparent silicone for windows immediately after
assembly and painting to ensure full resistance to driving rain.
Otherwise extreme rainfall may lead to interior leaks which cause discoloration and damage to the wood.
The manufacturer will accept no liability for such damage, there will be no replacement within the scope of
the guarantee nor is it covered by the manufacturer's warranty. We therefore refer you again to our
guarantee conditions at this point.
The roofing felt provided serves primarily as a temporary protection against the weather. TO ensure lasting
protection we recommend you to cover the roof only with sanded bitumen shingles. This creates the basis for
a long life and resistance to the influences of the weather. Otherwise damage to your weka product is to be
expected.
Tools
You should have the following tools to hand before beginning assembly:
Tape measure
Drill
Electric screwdriver Hammer Pencil
Burring iron
Rubber mallet
Saw
Spirit level
Spanner
Abbreviations
RW = Rear wall
WS = Wall thickness
mm = Millimetre
cm = Centimetre
= Not included in delivery!
We hope you have a successful installation and wish you many happy hours enjoying your weka
product.
10
 Copyright weka-Holzbau GmbH, Neubrandenburg
Techn. Änderungen vorbehalten!

Publicité

loading

Ce manuel est également adapté pour:

348.1624 série