5 - POSITIONING
Check that the floor can support the weight of the unit in
operation:
2
A - > 287 Kg/m
(190/1.5-H31)
2
> 310 Kg/m
(190S with solar)
2
B - > 412 Kg/m
(300/3.5E-H31 )
2
> 435 Kg/m
(300S with solar)
If installed in inclosed space
The unit must be located in a space >15m³, and must have
unrestricted air flow.
Make sure there is enough Installation space.
For optimal efficiency and serviceability, the following
clearances should be maintained: 400mm on the air inlet
side, 400mm on the air outlet side, 600mm in the back, and
600mm in the front.
Install the unit in the indoor space, it is not allow to install the
unit at the rainy space
In case of rain entering to internal components of the unit, the
component might be damaged or causing physical danger.
5.5 ELECTRICAL OUTLET
The installation height of power supply should be over 1.5m, if
separate the power supply from water.
Configuration for electric power socket (schuko + On/Off
switch) close to the unit
The plug must be accessible at all moment.

5.6 - CONDENSATE DRAIN

Condensate may be leaked from unit if drainage pipe is
blocked, a drainage pan is recommended as shown as
following figure.
Barrier
Heat pump
50mm larger than the diameter of
unit
17

Hide quick links:

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Awhm-tdf 300

Table des Matières