12
or the fitting InFit 76*-*** or InTrac 7**-*** or other appropriate fitting
must be electrically connected to the equipotential bonding system.
5. The metal body of the conductivity sensors or the safety weld-in socket or
the fitting InFit 76*-*** or InTrac 7**-*** or other appropriate fitting is
optionally included in the routine pressure test of the system.
3
Initial start-up
3.1
Installation
The sensors are to be mounted in such a way that the sample medium
flows directly into the sensor through the orifice at the tip and re-emerges
through the vent holes. Any other installation position of the sensors can
create the risk of formation of airlocks, or of contamination through depos-
its of solid matter.
Flow of medium must be accross the face of the sensor. Air bubbles and
solid matter deposits are to be avoided. A minimum clearance of 30 mm
(1.18") between sensor and pipe wall must be maintained (see drawing
above).
Vertical mounting (top entry) in a pipe is recommended only if the pipe is
full and no air bubbles are able to develop in the flow.
In the event of side mounting (side entry) of the sensor, vertical upward
flow of sample process medium must be ensured.
InPro 7100-VP Series
52 002 092
Flow
direction
T-piece
© 02 / 2017 Mettler-Toledo GmbH, CH - 8606 Greifensee
Flow direction
Sensor
InPro 7100-VP Series