Zephyr Tidal I AK7300AS Guide D'utilisation, D'entretien Et D'installation page 19

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ZEPHYRONLINE.COM
PBD-1300B Dual Blower Installation
NOTE: To secure the 10" transition adapter to top of hood a cut out of 14-1/2" width x 10-1/2" depth
will need to be made in the cabinet bottom.
If internal cabinet dimensions prevent this size of a cut out then the 10" transition adapter may be
mounted to the cabinet bottom rather than the top of the hood. Cut out dimensions for this type of
installation are 13-1/4" width x 6-1/4" depth.
Tidal I Use, Care, and Installation Guide
Installation Instructions
9. Refer to page 32 section for this
step. Connect the wiring from
the dual blower including both
blower plugs, blower cable 6 pin
connector (E), dual blower switch
cable (H), black single pin power
cord from dual blower (K), and
white single pin power cord (F) to
dual blower PCB.
10. Place 10" round adapter
(included with PBD-1300B) on top
of hood and secure with (4) M3.5
x 8 screws.
19

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Tidal i ak7336as

Table des Matières