7
[Fig. 7.1.1]
[Fig. 7.1.2]
[Fig. 7.2.1]
Max. 20m [65 ft]
1.5-2 m [5 to 7 ft]
B
A
K
B
D
E
F
F
H
[Fig. 7.2.2]
K
J
A
B
35
[1-13/32]
25 [1]
C
D E
A Indoor unit
B Insulation pipe (long) (accessory)
C Tie band (accessory)
D Visible part
E Insertion margin
F Drain hose (accessory)
G Drain pipe (O.D. ø32 mm [1-1/4 in] PVC TUBE, field supply)
H Insulating material (field supply)
I Tie band (accessory)
J Max.180 ± 5 mm [7-3/32 ± 7/32 in]
K To be gap free. The joint section of the insulation material meet must be
at the top.
A Cut here
B Remove brazed cap
A
A Cool by a wet cloth
C
L
M
D
D
F
G
I
(Unit: mm [in])
G
F
H
25 [1]
E
I
7.1
[Fig. 7.1.3]
A
A
D
7.2
Max. 300 mm [11-13/16 in]
N
B
J
F
O
[Fig. 7.2.3]
A
5
[7/32]
D
A Indoor unit
B Insulation pipe (short) (accessory)
C Tie band (accessory)
D Band fixing part
E Insertion margin
F Drain hose (accessory)
G Drain pipe (O.D. ø32 mm [1-1/4 in] PVC TUBE, field supply)
H Insulating material (field supply)
I Max.145 ± 5 mm [5-23/32 ± 7/32 in]
C
B
A Thermal insulation
B Pull out insulation
E
C Wrap with damp cloth
D Return to original position
E Ensure that there is no gap here
F Wrap with insulating tape
F
Correct piping
Wrong piping
A Insulation (9 mm [3/8 in] or more)
B Downward slope (1/100 or more)
C Support metal
K Air bleeder
L Raised
M Odor trap
Grouped piping
D O. D. ø32 mm [1-1/4 in] PVC TUBE
E Make it as large as possible. About 10 cm [3-15/16 in].
F Indoor unit
G Make the piping size large for grouped piping.
H Downward slope (1/100 or more)
I O. D. ø38 mm [1-1/2 in] PVC TUBE for grouped piping.
(9 mm [3/8 in] or more insulation)
J Up to 550 mm [21-21/32 in]
N Drain hose (accessory)
O Horizontal or slightly upgradient
(Unit: mm [in])
I
G
B
F
25 [1]
H
E
C
3