Refrigerator Use; Power On/Off Switch - Thermador T42BR810NS Guide D'utilisation Et D'entretien

Masquer les pouces Voir aussi pour T42BR810NS:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Style 2 – Non-Dispenser Models
IMPORTANT: After connecting the refrigerator to a water source
or replacing the water filter, fill and discard two full containers of
ice to prepare the water filter for use, before using the ice.
Do not use with water that is microbiologically unsafe or of
unknown quality without adequate disinfection before or
after the system.
1. Turn on the ice maker. Lower the wire shutoff arm as shown.
Please refer to "Ice Maker and Storage Bin" for further
instructions on the operation of your ice maker.
WARNING
Electrical Shock Hazard
Plug into a grounded 3 prong outlet.
Do not remove ground prong.
Do not use an adapter.
Do not use an extension cord.
Failure to follow these instructions can result in death,
fire, or electrical shock.
WARNING
Explosion Hazard
Keep flammable materials and vapors, such as
gasoline, away from refrigerator.
Failure to do so can result in death, explosion, or fire.

Power On/Off Switch

If you need to turn the power to your refrigerator On or Off, you
must remove the top grille assembly to access the power switch.
Turn the power to the refrigerator Off when cleaning your
refrigerator or changing light bulbs.
To Remove Top Grille:
1. Grasp both ends of the top grille.
2. Push the top grille straight up, then pull straight out. Lay the
grille on a soft surface.
6
NOTES:
NOTE: If your model has a base grille filter system, make sure the
base grille filter is properly installed and the cap is in the
horizontal position.

REFRIGERATOR USE

To Replace Top Grille:
1. Insert top grille hooks (located on the back of the top grille)
onto mounting bolts on the side trim.
2. Pull grille down slightly to lock into place.
Turn Power On or Off:
1. Remove top grille.
2. Press power switch to the On or Off position.
3. Replace top grille.
IMPORTANT: Be sure the power switch is set to the On position
after cleaning refrigerator or changing light bulbs.
Allow 24 hours to produce the first batch of ice.
Allow 3 days to completely fill ice container.
Depending on your model, you may want to select the
maximum ice feature to increase the production of ice.
B
A
A. Top grille
B. Cabinet side trims
A. Power switch
B
A

Publicité

Table des Matières
loading

Table des Matières