•
Use protective gloves when you do maintenance on
the blades. The blades are very sharp and cuts can
easily occur.
•
Accessories and changes to the product that are not
approved by the manufacturer, can cause serious
injury or death. Do not change the product. Always
use accessories that are approved by the
manufacturer.
•
If the maintenance is not done correctly and
regularly, the risk of injury and damage to the
product increases.
To remove the product from the carton
1. Remove loose parts included with the product. Cut
the four corners of the carton and put the end panels
down flat.
2. Remove the two screws that attach the auger
housing to the pallet. Remove the steel brackets
from the skid plates if they have it.
3. Remove all package materials.
4. Remove the product from the carton and make sure
no loose parts are left in the carton.
Loose parts
(Fig. 29)
Knob (3)
(Fig. 30)
Discharge chute (1)
(Fig. 31)
ON/OFF key (s)
(Fig. 32)
Carriage bolts 5/16-18 x 2 ¼" (2)
(Fig. 33)
Handle knobs (2)
(Fig. 34)
Locknut 3/8 (1)
(Fig. 35)
Cable guide (1)
(Fig. 36)
Shear pins ¼-20 x 1-¾ (6)
(Fig. 37)
Locknuts ¼-20 (6)
(Fig. 38)
Locknut 5/16-18 (1)
(Fig. 39)
Locknut ¼-20 (1)
(Fig. 40)
Nylon washer (1)
(Fig. 41)
Carriage bolt 5/16-18 x 5/8 (1)
(Fig. 42)
Spring (1)
(Fig. 43)
Shoulder bolt ¼-20 (1)
To install the handle
1. Raise the upper handle to the operating position.
(Fig. 51)
12
•
Only do the maintenance as given in this operator's
manual. All other servicing must be done by an
approved service agent.
•
Let an approved service agent do servicing on the
product regularly.
•
Replace damaged, worn or broken parts.
Assembly
2. Adjust the handle position to one of the mounting
holes (B) and tighten the handle knobs (C) with the
carriage bolts (D). (Fig. 52)
3. Install more carriage bolts (D) and handle knobs (C)
to secure the upper handle (A) to the lower handle
(E). (Fig. 53)
To install the chute deflector and chute
rotator head
1. Put the chute deflector assembly on the top of the
chute base with the discharge opening in the
direction of the front of the product.
2. Put the chute rotator head (A) on the chute bracket
(B). Rotate the chute assembly to align the pins
under the chute rotator head with the holes in the
chute bracket if it is necessary.
3. Put the chute rotator head on the pin (C) and the
threaded stud (D) on the mounting bracket (E).
4. Attach a locknut (G) on the threaded stud and
tighten. (Fig. 54)
5. Put the cables through the cable guide (F) and the
double clip (I) to attach the rotator cable (H) to the
lower handle. (Fig. 55)
To install the chute deflector remote
control
1. Attach the remote cable bracket (A) to the discharge
chute with a carriage bolt (B) and a 5/16-18 locknut
(D). Tighten the bolt.
2. Install the remote cable eyelet (E) to the chute
deflector (F) with a shoulder bolt (G), a nylon washer
(C), and tighten with a ¼-20 locknut (K). The cable
eyelet will be loose on the shoulder bolt.
3. Attach the spring (L) between the hex nut (M) on the
chute rotator head and the hole on the chute
deflector. (Fig. 56)
4. Attach the lever control knobs (N) by pressing them
down on the control levers (O). (Fig. 57)
1481 - 003 - 11.05.2020