Télécharger Imprimer la page

Weka 606.3060.30.00 Notice De Montage, D'utilisation Et D'entretien page 5

Publicité

Les langues disponibles

Les langues disponibles

- en -
Dear customer
Thank you very much for choosing a weka product.
Read these instructions through completely before assembling your product in order to avoid
errors in assembly or damage.
IMPORTANT
Please use the enclosed packing list to check immediately that your weka product has
been delivered complete and intact.
Please do not dispose of the packing list before the guarantee period has expired. This list
enables you to check that all the individual parts are present. It should be retained along with the
proof of purchase. Any complaints which may arise can probably be easily rectified with this list.
The item numbers on the packing list do not correspond to the item numbers in the following
assembly instructions.
We recommend that 2 people carry out the assembly.
In order to prevent accidents, we recommend that children are kept out of the direct vicinity during
assembly.
We reserve the right to make further technological developments. This means that there many be
minor deviations in the illustrations.
Please do not simply throw away the packaging material. Paper, card and corrugated board as
well as plastic packaging materials should be placed in the correct collection containers.
Our structural strength class covers more than 80% of the Federal Republic of Germany (snow load =
0.75kN/m² => snow load zone 2).
If your project is outside this zone and if additional calculations or structural modifications are required,
these are not included in the quoted price.
Recommendations
Please drill pilot holes for all screw connections to avoid damaging the wood. The following
symbol in the instructions will indicate when this is necessary:
Protect the wood from hours of direct sunlight and moisture.
Wood is a natural product. Fluctuations in colour, knots and cracks are normal and have no
influence on the statics.
A prerequisite for successful assembly, is the anchoring of the studs in the concrete foundation
using H stud supports. The stud supports are available as weka accessories for an additional cost.
A foundation plan can be obtained from your specialist dealer!
In order to facilitate the precise alignment of the H anchors, mark the necessary post clearances
on a piece of guide wood and fix the anchors in place with screw clamps (figure 1)
Then suspend the H anchors in the base holes already prepared. A minimum clearance of 2 cm is
to be maintained between the upper edge of the foundation and the upper strut.
The required roof pitch of 1% (gradient towards the rear) can be achieved by varying the height of
the stud supports.
The required gradient can also be achieved by shortening the studs.
After the holes have been filled with B25 concrete, the foundation must be allowed to set for at
least 3 days.
Techn. Änderungen vorbehalten!
+
Alle Maßangaben sind ca. Maße.
5
 Copyright HRB 3662

Publicité

loading