Elica EMG636S1 Guide D'utilisation, D'entretien Et D'installation page 12

Masquer les pouces Voir aussi pour EMG636S1:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Measure from the bottom of the air deflector to the
bottom of the hood outlet, as shown.
A.
Dimension to measure
Cut the duct at the measured size.
Slip the duct onto the bottom of the deflector.
Place the duct over the exhaust outlet from the hood.
Use duct tape to seal the deflector and at the exhaust
outlet from the hood.
Place charcoal filters. See "Maintenance" section.
12
Duct cover installation (both ducted and non ducted versions)
Attach the upper duct covers using 6 - 3.5x6.5 mm screws.
NOTE: For non-ducted (recirculating) installation, the slotted
holes in the upper duct covers will be visible when assembled.
For ducted installations, the slotted holes will be hidden down
inside the lower duct covers.
A
Place lower duct covers using one plastic bracket at
each side (4 needed).
B
A.
Upper duct covers
B.
4 - 3.5x6.5 mm installation screws
C.
2 - 2.9x3 mm screws
A
A.
Lower duct covers
B.
4 - Duct cover plastic bracket
A
C
B

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Emg642s1

Table des Matières