Bench Alignment - Blatchford Elite2 Instructions D'utilisation

Masquer les pouces Voir aussi pour Elite2:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6 Bench Alignment

½
*
Approx.
1/3
Build
Line
½
0-10mm
2/3
Static alignment
Setup length
With flexion, adduction and abduction
properly accommodated, set the limb length
5 mm longer than the sound side to allow for
compression and deflection of the foot springs
during gait. This should be re-assessed once
the dynamic trial commences and the length
adjusted accordingly.
Build line
This should fall 10 mm anterior to the centre
of the pyramid (with heel height properly
accommodated). The socket should be
positioned accordingly.
Dynamic alignment
Coronal plane
Ensure that M-L thrust is minimal by adjusting
relative positions of socket and foot.
Saggital plane
Check for smooth transition from heel strike
to toe-off. Ensure also that when standing the
heel and toe are evenly loaded and that both
are touching the floor.
Trans-femoral alignment
Align trans-femoral components according
to fitting instructions supplied with the knee,
keeping the build line relative to the foot as
shown.
*
6
Allow for users
own footwear
938223/14-1219

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

El24l1El30r9El24l1dEl30r9d

Table des Matières