Red Sea MAX C-Series
5 Assembly
Perform the assembly and installation of all of the components in the
order described below before adding the water to the system.
NOTE: Left and Right designations in this manual are when looking
from the front of the Aquarium.
5.1 Cabinet assembly
WARNING: If you are not experienced in the construction of self
assembly furniture, seek suitably qualified assistance.
Detailed instructions for the assembly of the MAX
in the accompanying graphic manual.
The assembly of the cabinet requires the use of a regular crosshead
screwdriver. Do not use an electric screwdriver.
Hardware for the assembly of the cabinet may be found in the Accessory
Parts box packed inside the aquarium.
Adjustment of the Push-To-Open (PTO)
door opening unit.
Pressing the end of the PTO unit by 1.5mm
forward by 5cm (2") to the open position.
Pushing the PTO shaft back inside the cabinet will lock it in the closed
position.
After assembling the cabinet door, make sure that the PTO is in the
closed position and allow the soft close hinges to fully close the door.
With the door in the closed position press the door in the region of the
8
®
C cabinet can be found
(
1/16") will spring the shaft
PTO. The door should spring open. If the door does not spring open
adjust the position of the PTO by rotating the front end of the shaft
anticlockwise half a turn. Repeat this adjustment until pressing the door
causes the PTO to operate.
After assembly, place the cabinet in the desired location.
5.2 Cabinet mounted Power Center
Remove the Splash Cover from the Power Center by sliding it towards the
front.
Align the mounting holes on the base of the Power Center with the
threaded plastic inserts on the internal wall of the cabinet.
Use the 4 long M4 screws and 1 short M4 screw as indicated to attach the
Power Center to the wall. Do not over-tighten the screws.
Pass the main cable through the hole in the rear of the cabinet and check
that it is able to reach the electric wall outlet. Do not plug the power
center into the wall outlet until instructed at the appropriate time in the
assembly process. Check that
all of the switches are in the
"off" position.
Stick the socket identification
label (showing the connection
between sockets and switches)
inside the cabinet, above the
power center.
Cabinet mounted Power Center