Télécharger Imprimer la page

Assembly Of Components; Parts List - Bradley S19-430EH Manuel D'installation

Publicité

Les langues disponibles

Les langues disponibles

S19-430EH
Installation for Combination Unit
NOTE: Close water supply lines BEFORE
adding hose assembly.
Step 1: Connect hose and water supply
1. Remove the 3-1/8" pipe connected to the
eyewash valve.
2. Connect one pipe nipple, the pipe tee, and
the other pipe nipple (in that order) between
the eyewash valve and the union as shown in
Figure 2.
• Apply pipe sealant (supplied by installer)
to all pipe joints.
• Use strap wrench around pipes to prevent
pipe marring.
3. Mount the hose clip to the vertical piping
using the hardware provided (see Figure 2).
4. Open the water supply line and check for
leaks and adequate water flow.

Assembly of Components

4.2
4
4.1
1
4
2.1
2
2.2
3.1
3.2
3.3
2.3
2.4
3.1
5
R
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
Date
Signed
Date
Signed
Datum
Unterschrift
Date
Signed
Date
Signe
Date
Signed
8/22/07
Figure 2

Parts List

Item
Part No.
1
S89-002
2
S19-787
2.1
S53-063
2.2
S05-158
2.3
113-544A
3
2.4
S27-265
3
S45-831
3.1
269-681
3.2
140-601
3.3
142-002BS
4
S45-896
4.1
113-006LG
4.2
269-852
5
204-421
Bradley Corporation • 215-868 Rev. H; ECN 07-526
Installation
Qty
Description
1
3/8" Yellow Hose
1
EFW Assembly
1
Dust Cover
1
EFW Sprayhead
1
Nipple (plated)
1
Valve Assembly
1
Hose Holder Fittings
1
U-Bolt with Nuts
1
Bracket - Wall
2
Lockwasher
1
Hose Hook-Up Prepack
2
Close Nipple
1
Reducing Tee
1
Emergency Inspection Tag

Publicité

loading