ALLIANCE D677I Installation/Fonctionnement/Entretien page 24

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
3. Remove the three silver screws holding the three
wires to the terminal block terminals. Remove
green ground screw holding power cord ground
wire to rear bulkhead. Save all four screws.
Loosen the strain relief screw and pull the cord or
wires out through the rear of the dryer.
4
1
Silver L1 Terminal Screw
2
Silver Neutral Terminal Screw
3
Silver L2 Terminal Screw
4
Green Ground Screw
Figure 23
4. Attach one end of green ground wire (supplied in
accessories bag) to rear bulkhead using green
ground screw removed in step 3.
IMPORTANT: Do not use power screwdriver when
tightening ground screw or terminal block screws.
1
1
Ground Screw
Figure 24
22
1
2
3
DRY2017N
DRY2018N
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
5. Use the three silver screws removed in step 3 to
attach the wires from the new power cord and the
other end of the green ground wire to the terminal
block as shown in Figure 25.
NOTE: Green ground wire must be connected to
center (neutral) terminal of terminal block.
8
7
6
1
Ground to Neutral Wire
2
Neutral Terminal
3
L2 Terminal
4
Center (Neutral) Wire
5
Strain Relief (not supplied with dryer)
6
Green Ground Screw
7
L1 Terminal
8
Ground Wire
Figure 25
6. Tighten all screws and reinstall access cover
removed in step 2.
IMPORTANT: Failure to tighten these screws
firmly may result in wire failure at the terminal
block.
7. Secure the strain relief to the power cord, or
wires, where they enter the dryer cabinet.
8. Check the continuity of the ground connection
before plugging the cord into an outlet. Use an
acceptable indicating device connected to the
center grounding pin of the plug and the green
screw on the back of cabinet.
9. Reinstall access cover and screw.
10. Restore power to dryer.
1
2
3
4
5
DRY2015N
512681

Publicité

Chapitres

Table des Matières
loading

Table des Matières