GE AF-650 GP Guide Rapide page 5

Masquer les pouces Voir aussi pour AF-650 GP:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installation
Voltage
Power Size
0.25–3.7kW 0.33–5HP
200–240V
5.5–22kW 7.5–30HP
> 22kW / 30HP
0.37–7.5kW 0.5–10HP
380–480V
11–45kW 15–60HP
3
3
> 45kW / 60HP
0.37–7.5kW 0.5–10HP
525–600V
11–45kW 15–60HP
> 45kW / 60HP
525–690V
all
Table 3.1 Minimum Airflow Clearance Requirements
3.3.2 Lifting
Check the weight of the unit to determine a safe
lifting method
Ensure that the lifting device is suitable for the
task
If necessary, plan for a hoist, crane, or forklift with
the appropriate rating to move the unit
For lifting, use hoist rings on the unit, when
provided
3.3.3 Mounting
Mount the unit vertically
The drive allows side by side installation.
Ensure that the strength of the mounting location
will support the unit weight
Mount the unit to a solid flat surface or to the
optional backplate to provide cooling airflow (see
Illustration 3.2 and Illustration 3.3).
Improper mounting can result in overheating and
reduced performance.
Use the slotted mounting holes on the unit for
wall mounting, when provided.
4
AF-650 GP Quick Guide
Clearance a/b
100mm / 4in
200mm / 8in
225mm / 10in
100mm / 4in
200mm / 8in
225mm / 10in
100mm / 4in
200mm / 8in
225mm / 10in
225mm / 10in
Item A is a backplate properly installed for required airflow
to cool the unit.
NOTE
Backplate is needed when mounted on railings.
DET-759A
Illustration 3.2 Proper Mounting with Backplate
Illustration 3.3 Proper Mounting with Railings

Publicité

Table des Matières
loading

Table des Matières