COMFORT
EN
IF AN ORIGINAL HATCH IS FITTED, REMOVE
A
THE HATCH TO USE THIS GAP WHEN
ASSEMBLING
OTHERWISE:
* Position the evaporation unit on the roof, avoiding
any contact with solar plates, antennas, etc, and
follow these steps using this as a reference:
Align the frame on the roof (from inside the cabin)
1
and mark out on the inside.
Make (4) bores at the corners of the mark from the
2
inside and in the top section. Cut the wadding and
the false ceiling (using a knife or cutter) and then
make the cut on the outer part with a fretsaw, using
the previously made mark as a guide.
!
TAKE CARE NOT TO CUT ANY CABLES
YOU MAY COME ACROSS.
THE
EVAPORATION
UNIT,
2
12
1
1
2