GreenWorks BLM303 Mode D'emploi page 2

Masquer les pouces Voir aussi pour BLM303:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 17
EN
1
Description.................................... 4
1.1
Purpose...................................................... 4
1.2
Overview.................................................... 4
2
Safety............................................ 4
3
Installation..................................... 4
3.1
Unpack the machine...................................4
3.2
Install the tube............................................ 4
3.3
Install the battery pack............................... 4
3.4
Remove the battery pack........................... 4
4
Operation.......................................5
4.1
Start the machine....................................... 5
4.2
Stop the machine....................................... 5
4.3
Cruise control lever.................................... 5
1
DESCRIPTION
1.1
PURPOSE
The machine is used to propel air out of a tube to move
unwanted materials such as leaves in the yard. Some
machines also suck in leaves and small twigs through a
vacuum, and shred them into a bag.
1.2
OVERVIEW
Figure 1 - 4.
1 Trigger
2 Turbo button
3 Cruise control lever
4 Tube release button
2
SAFETY
Make sure that you do/obey all safety instructions.
Refer to Safety Manual.
3
INSTALLATION
3.1
UNPACK THE MACHINE
Make sure that you correctly assemble the machine before
use.
If the parts are damaged, do not use the machine.
If you do not have all the parts, do not operate the
machine.
If the parts are damaged or missing, speak to the service
center.
5 Tube
6 Lock button
7 Slot
8 Battery release button
WARNING
WARNING
WARNING
English
4.4
Turbo button............................................... 5
4.5
Operation tips............................................. 5
5
Maintenance..................................5
5.1
Clean the machine..................................... 5
6
Transportation and storage........... 5
6.1
Move the machine...................................... 5
6.2
Store the machine...................................... 5
7
Troubleshooting.............................5
8
Technical data............................... 6
9
Warranty........................................ 6
10 EC Declaration of conformity.........6
1. Open the package.
2. Read the documentation in the box.
3. Remove all the unassembled parts from the box.
4. Remove the machine from the box.
5. Discard the box and package in compliance with local
regulations.
3.2
INSTALL THE TUBE
Figure 2.
1. Move the tube until the lock button engages into the slot.
You can use the nozzle to increase airflow in tight areas.
3.3
INSTALL THE BATTERY PACK
Figure 3.
If the battery pack or charger is damaged, replace the
battery pack or the charger.
Stop the machine and wait until the motor stops before
you install or remove the battery pack.
Read, know, and do the instructions in the battery and
charger manual.
1. Align the lift ribs on the battery pack with the grooves in
the battery compartment.
2. Push the battery pack into the battery compartment until
the battery pack locks into place.
3. When you hear a click, the battery pack is installed.
3.4
REMOVE THE BATTERY PACK
Figure 3.
1. Push and hold the battery release button.
2. Remove the battery pack from the machine.
4
TIP
WARNING

Publicité

Table des Matières
loading

Table des Matières