Installation; Mounting; Opening The Device/Electrical Connection - Eaton 32 A Mode D'emploi

Masquer les pouces Voir aussi pour 32 A:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig. 4
Item 2
Fig. 5
View 1
View 2
L2
L1
PE
Item 1
Item 2
Item 2
Item 1
Fig. 6
Item 3
Item 1
Item 2
Item 3
Fig. 7
Item 2
Item 1
Fig. 8
Item 2
Item 1
Plug and socket system 32 A, GHG 522
Applications other than described are not
permitted without CCH's prior written
Item 1
consent.
Item 3
For the operation, the instructions stated in
section 7 of the operating instructions will
habe to be observed.
In the open air, the plugs must be kept with the
plug opening (pin side) pointing downwards or
be closed with protective plug caps available as
an optional extra (see general catalogue).
L3
6

Installation

For the mounting and operation, the
N
respective national regulations (e. g. ElexV,
equipment safety law for Germany) as well as
the general rules of engineering will have to
be observed.
6.1

Mounting

The wall sockets can be mounted without
opening their enclosure.
In case the wall sockets are mounted directly
onto the wall, they may rest evenly only at the
respective fastening points. The chosen screw
shall match the fastening hole (see dimensional
drawing) and it must not damage the hole (e. g.
use of a washer). The device shall be fastened
diagonally with at least 2 screws.
The wall sockets and flange sockets shall be
mounted so that the plug hole does not
point upwards.
The wall sockets can be clipped onto the CEAG
mounting plate size 5. They are laterally pushed
into the guiding groove on the left-hand side of
the mounting plate.
The respective mounting instructions will have
to be observed.
A
Item 4
A
Fastening point A
wall socket 32A with switch
6.2
Opening the device/
Electrical connection
The electrical connection of the device may only
be carried out by skilled staff.
The insulation of the conductors shall reach
up to the terminal. The conductor itself shall
not be damaged.
Taking into account the respective regulations,
the properly bared conductors of the cables
shall be connected.
The electrical connection of the plugs is
established as shown in fig. 4 and 5:
The plug insert (item 2, fig. 5) is removed from
the pin bushing (item 1, fig. 5), after the
fastening screws (item 3, fig. 4) have been
unscrewed. Thereafter, the plug insert can be
connected to the connections of the plug pins
(see view 1, fig. 5).
Attention: When the fastening screws (item 3,
fig. 4) get lost, they will have to be replaced
by similar screws or to be ordered directly
from the manufacturer.
Assembly is made in inverse order, after the
cable has been connected.
The inlets are electrically connected as shown
in fig. 6 to 8.
Fig. 6: After unscrewing the two screws item 3,
the plug insert item 2 is removed from the
flange item 2.
Fig. 7: Now the connecting leads item 4 can be
connected to the terminals of the plug insert
item 2 as described in point 6.2.
Fig. 8: Finally, using the self-cutting screws
item 3, the plug insert item 2 is screwed into
the flange, observing its proper position.
The connectable min. and max. conductor
cross-sections shall be observed
(see technical data).
All screws and/or nuts of the supply terminals,
also of those remaining vacant, shall be
tightened down.
A
The supply terminals are designed for the
connection of copper conductors. If multi- or
fine-wire connecting cables are used, the wire
ends will have to be handled in acc. with the
applicable national and international rules
(e.g. use of sleeves for strands).
A
GB
9

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

3-polig4-polig5-poligGhg 522

Table des Matières