Kraus KGD-410B Manuel D'installation page 13

Table des Matières

Publicité

Option B: UNDERMOUNT INSTALLATION / INSTALLATION ENCASTRÉE
1. Trace Opening / Tracer l'ouverture
·
Locate the undermount template in the box.
·
Trouver le gabarit d'installation encastrée dans la boîte.
Cut carefully along the dotted lines. Keep the inside portion of the template. It contains important
·
information concerning care and maintenance for your new sink.
·
Le découper soigneusement le long des lignes pointillées. Conserver la partie intérieure du gabarit.
Il contient des informations importantes concernant l'entretien du nouvel évier.
·
Place the template on the counter, in the location where you will be installing the sink. When
placing the template, note the location of cabinet doors and panels to ensure that they are
compatible with sink installation. Make sure that there is enough space for water supply installation.
Identify the location of the faucet and soap dispenser.
·
Placer le gabarit sur le comptoir, à l'endroit où sera installé l'évier. En plaçant le gabarit, noter
l'emplacement des portes et des panneaux de l'armoire pour veiller à ce qu'ils soient compatibles
avec l'installation de l'évier. Veiller à ce qu'il y ait suffisamment d'espace pour l'installation de
l'approvisionnement en eau. Déterminer l'emplacement du robinet et du distributeur de savon.
·
Fix the template to the counter using masking tape.
·
Fixer le gabarit au comptoir à l'aide de ruban-cache.
·
Trace the inside of the template with a pencil. Remove the template from the countertop.
·
Tracer l'intérieur du gabarit avec un crayon. Retirer le gabarit du comptoir.
13

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Kgd-412bKgd-433bKgu-413bKgu-434b

Table des Matières