Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

On building sites, the MQ DA 3 may only be connected
to an electric 1~230 V 50 Hz 16 A power supply with a
corresponding fault current circuit breaker .
In order to avoid any faults from occurring, and de-
pending on the workload, the device should be clea-
ned in regular intervals either during or after use .
In order to prevent the cable from overheating, the
cable must be fully unrolled when using an extension
cable or a cable drum .

03. StARtInG UP

1 . Check to ensure that the inlets and outlets are
unblocked . Remove any blockages or foreign ob-
jects from the nozzles or ducts .
2 . Install all the necessary elements for restorative
drying (water spearator, filter, compressor and
sound absorbers) .
3 . Connect the hoses coming from the drill holes to
one side of the DA 3i .
4 . Connect the hoses leading from the DA 3i to the
water separator for restorative drying .
5 . Use the screw ad-
apter to connect the
moisture sensor to
the inlet of the quad
distributor at the
compressor . (fig .2)
6 . Connect the unit to
the mains supply
power .
7 . The unit is now
ready for operation
and only needs to
be
switched
on .
Switch the unit on .
The control lamp is on . The unit is now in operation .
8 . The DA 3i operates in intervals . Each interval
comprises three operating cycles:
EN
• Operating cycle 1: The unit carries out an instal-
• Operating cycle 2: Two channels are closed. The
• Operating cycle 3: The unit selects the channel
• The new interval starts with Operating Cycle 1 and
• The intervals are repeated until there is an equally
Operating range :
The air flow control unit is designed for 350 m³/h and
can operate with vacuum pressure up to 250 mbar .
This makes the unit excellently-suited for use with
most compressors and other components that are
also commonly used in restorative drying after water
damage .
The DA 3i can be installed as the bottom element of
the MultiQube tower (fig .1) . Alternatively, it can also be
installed separately closer to the core drill holes (fig .2) .
Operating manual – DA 3i Flow Rate Control Unit
lation check . All three channels are open .
moisture values are measured in the only remai-
ning open channel .
with the highest moisture value and opens it for a
few minutes .
is carried out in the same manner as the previous
interval .
low amount of remaining moisture in all three
channels . The final interval is then commenced .
The channels are all opened and the drying pro-
cess is completed .
B - 3

Publicité

Table des Matières
loading

Table des Matières