Installation
The site of installation
should be at least 50 cm
from a light because heat
radiated from it may trig-
ger the sensor uninten-
tionally. To obtain the spe-
cified reach of 12 m, the
sensor should be installed
at a height of approx. 2 m.
Please ob-serve the safe-
ty warnings on page 12.
Installation procedure:
1. Undo screws on hous-
ing 2. Do not detach
wir-ing from terminal
block, but gently pull
entire terminal assembly,
including sensor unit
(cylindrical section), to
remove it.
3. Hold mounting plate
against wall/ceiling, mark
drill holes, paying atten-
tion to wiring runs con-
cealed in wall/ceiling. Drill
holes, insert wall plugs
(6 mm). 4. Break open
pre-punched cable entry
holes as appropriate for
concealed or surface-
mounted installation,
insert grommets, pierce
and pass cable through.
Installation with swivel mount
The swivel mount allows
you to turn the motion
detector horizontally. This
provides additional adju-
stment for the detection
zone.
1. Press cupped pieces
out of swivel mount
PK Elektronik Vertriebs GmbH, E-Mail: info@pkelektronik.com, Internet: www.pkelektronik.com
Note: For surface-mount-
ed wiring, it is recommen-
ded to install the swivel
mount (see below).
Alternatively, the unit may
be pierced at the thinner
section to pass the cable
through. 5. Screw mount-
ing plate to wall.
6a) Connecting the
mains lead
The mains lead consists of
a 2-3 phase cable
L
= phase conductor
N
= neutral conductor
PE = protective-earth
conductor
If you are in any doubt,
you must identify the
cables using a voltage te-
ster; then disconnect the
power supply again.
The phase (L) and neutral
conductor (N) are connec-
ted according to terminal
assignment. The protecti-
ve-earth conduct-or is
connected to the earth
terminal
.
A mains switch for 'ON'
and 'OFF' switching can
of course be installed in
the mains lead.
provided with sensor unit.
2. Hold swivel mount
against wall and mark drill
holes, drill the holes, insert
wall plugs, pass cable
through. Connect as de-
scribed in „Installation".
3. Pass screws through
(s. fig. page 3)
6b) Connecting the load
supply lead
The load supply lead (e.g.
light) is also a 2 to 3-core
cable which is connected
to terminals N and L'. The
live conductor must be
connected to the terminal
marked L'.
Connect the neutral con-
ductor to the terminal
marked N together with
the neutral conductor of
the mains power supply
lead. The protective-earth
conductor is connected to
the earth terminal
7. Once wiring is complet-
ed, insert terminal block
together with sensor unit
into mounting plate ,
fit housing cover and
secure in place with faste-
ning screws.
cupped pieces and
secure swivel mount in
such a way that the screw
head is positioned on the
smooth side and the
domed side rests against
the mounting plate (see
diagram).
.
13