Télécharger Imprimer la page

dirna Bergstrom bycool green line COMPACT 2.0 Instructions De Montage page 20

Masquer les pouces Voir aussi pour bycool green line COMPACT 2.0:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

COMPACT 2.0
EN
ES
To place the front (at the previous mentioned)
14
spigots with (1) washer M6 wide wing and
(1) nut M6 in each spigot. To tight nuts til the
rubber ducting til run into the upper rubber of
the unit.
Important: The rubber ducting must being
run into the upper rubber of the unit to
avoid air leaks
14
EPDM
Gasket
Cabin roof
Upholstey
Tighten nut mentioned under point 11 until it
15
touches upper surface of front.
15
EPDM
Gasket
Cabin roof
Upholstey
Place console and centre equipment in the
16
most convenient place of cabin roof. Once
centred, remove console for later installation.
Unit base
Nut M6
Stud M6
Unit base
Nut M6 (11)
Nut M6
Stud M6
Rubber ductings
Rubber ductings
20
Air conditioning for vehicles
Foam Gasket
front with louvers
Foam Gasket
front with louvers

Publicité

loading