Installation in the i-fill filling system for heating circuits
Fig. 6:
Front insulation shell; water flow
direction
5. Insert the connectivity module into the recess of the front insulation shell so that the LAN
cable runs under the connectivity module (see Figure 8).
Fig. 8:
Connect cable and lay it under
the module
1
Bleeding hose
2
Hose routing
6. Route the LAN cable together with the 24 V DC cable underneath through the opening
(slot) of the front and rear insulation shell.
7. Open the cable tie, use the connection cable for the other cables and then close the
cable tie again (see Figure 9). Position the cable so that the assembly does not inhibit
both insulation shells.
8. Fit the bleeding hose into the guide duct of the front insulation shell (siehe Figure 8) and
join both shells without the use of force.
1702929 • 2019/08
Fig. 7:
Fig. 9:
JUDO Connectivity-Modul
Insert plugs A1 und A2 into ports
of control unit
Insert cable into cable tie
13